This new conference center facility was built as part of the continuing contract established in 2008 that is still active today. The campus includes a research […]
This is a continuing contract that requires conceptual review and coordination early on with the Owner’s Representative and then final pricing negotiation. These projects involve mechanical, […]
This fast paced, compressed schedule renovation was completed in (30) days. It included demolition and renovation of the interior, with modifications to the kitchen and front […]
This project utilized a design build contracting method and incorporated mechanical, electrical, data, access control, security, fire alarm, and emergency power systems for a global customer […]
For this project, we installed eco-lab equipment stations with 316 stainless steel welded pipe system. This was performed at six locations throughout the 80,000 SF facility. […]
This renovation included performance of (1) 5 ton 460V Chiller with Self Contained 1/2 hp Pump and Self Contained Controls. It also included (1) 20 Gallon […]
The design-build project is scheduled for completion in early 2014. The 14,000 square foot building will be a showroom for the Indian Motorcycles originally founded in […]
The Gainesville Fire Alarm Renovation/Retrofit Project was an existing Simplex/Grinnell panel that was last tested in 2011. The existing antiquated fire alarm system was 22 years […]
The USPS is upgrading several facilities across the State of Florida. The project in Ocala and Lecanto included energy upgrades for lighting, facility controls, and heating/cooling […]
This new construction LEED certified project included facility site lighting design for the entire site. Interior LED lighting was also installed. The project was finished on […]
The project included a rooftop helipad addition to an existing 4 story building. We fabricated and installed duct and ventilation systems. A new variable volume, chilled […]
Working carefully with the facility department on an occupied campus, this project included replacement of existing chiller with a (1) 600 ton YORK Variable Speed Water […]
We have done several projects at Ocala Regional Medical Center in the past 6 months that include new Air Handling Unit Controls for the Dining/Morgue and […]
The project included a rooftop helipad addition to an existing 4 story building and was a complete turn-key helipad with the necessary lighting, fire suppression systems, […]
The Gilchrist County Public Safety Department was previously housed in a small, frame, rental building converted from a residence when they applied for and received State […]
The historic Gilchrist County Courthouse was in great need of additional courtroom, holding cell, and administrative space. The Alexander Group was hired to design a facility […]
This project was constructed on an active, occupied campus with extremely limited access and built with minimal disruption to students and faculty despite the many site […]
The Kmart Distribution Center Project was a replacement of an existing system with a new Honeywell Lontalk control system, which included the controls and graphics for […]
While the facility remained 100% occupied with inmates, visitors, and law enforcement staff, the entire crew removed the existing facility’s (78) DX rooftop units with (16) […]
Climate Control Mechanical Services worked directly with the owner to furnish and perform the installation of (2) 12.5 ton commercial heat pump package systems. Both systems […]
Working with the contractor, this renovation included an equipment change out in an occupied building. It consisted of several air handler units, duct and pipe system, […]
This HVAC renovation was for a new pediatric emergency room in a central area of the hospital. The renovation of the existing hospital space included a […]
The project included the demolition of the existing cafeteria except for the concrete slab and block walls. A major addition was built, integrating the existing structure […]