• University of Florida IFAS Frank Stronach Science Center

    This new conference center facility was built as part of the continuing contract established in 2008 that is still active today.  The campus includes a research […]
  • United States Postal Service (USPS)

    This is a continuing contract that requires conceptual review and coordination early on with the Owner’s Representative and then final pricing negotiation. These projects involve mechanical, […]
  • Signature Brands LLC

    This renovation included performance of (1) 5 ton 460V Chiller with Self Contained 1/2 hp Pump and Self Contained Controls.  It also included (1) 20 Gallon […]
  • RideNow Powersports of Ocala

    The design-build project is scheduled for completion in early 2014. The 14,000 square foot building will be a showroom for the Indian Motorcycles originally founded in […]
  • Gilchrist County Emergency Operations

    The historic Gilchrist County Courthouse was in great need of additional courtroom, holding cell, and administrative space. The Alexander Group was hired to design a facility […]
  • Gilchrist County Emergency Operations

    The Gilchrist County Public Safety Department was previously housed in a small, frame, rental building converted from a residence when they applied for and received State […]
  • Gainesville High School

    This project was constructed on an active, occupied campus with extremely limited access and built with minimal disruption to students and faculty despite the many site […]
  • Building Services

    This HVAC renovation was for a new pediatric emergency room in a central area of the hospital. The renovation of the existing hospital space included a […]
  • A.L. Mebane Middle School

    The project included the demolition of the existing cafeteria except for the concrete slab and block walls. A major addition was built, integrating the existing structure […]