• True Grits Restaurant

    This fast paced, compressed schedule renovation was completed in (30) days.  It included demolition and renovation of the interior, with modifications to the kitchen and front […]
  • Sitel Operating Corporation

    This project utilized a design build contracting method and incorporated mechanical, electrical, data, access control, security, fire alarm, and emergency power systems for a global customer […]
  • Signature Brands LLC.

    For this project, we installed eco-lab equipment stations with 316 stainless steel welded pipe system. This was performed at six locations throughout the 80,000 SF facility. […]
  • Signature Brands LLC

    This renovation included performance of (1) 5 ton 460V Chiller with Self Contained 1/2 hp Pump and Self Contained Controls.  It also included (1) 20 Gallon […]
  • RideNow Powersports of Ocala

    The design-build project is scheduled for completion in early 2014. The 14,000 square foot building will be a showroom for the Indian Motorcycles originally founded in […]
  • Power Services

    This new construction LEED certified project included facility site lighting design for the entire site. Interior LED lighting was also installed. The project was finished on […]
  • Pearson Nissan

    This project was new construction of an auto dealership. It included a new two story sales area along with 28 new service bays and the following […]
  • Facility Controls

    The Kmart Distribution Center Project was a replacement of an existing system with a new Honeywell Lontalk control system, which included the controls and graphics for […]