This new conference center facility was built as part of the continuing contract established in 2008 that is still active today. The campus includes a research […]
This project was constructed on an active, occupied campus with extremely limited access and built with minimal disruption to students and faculty despite the many site […]
The project included the demolition of the existing cafeteria except for the concrete slab and block walls. A major addition was built, integrating the existing structure […]